Operational Site
North Star Junction
Operational Site Data
Location
Australia
Product
Solar Farm
Capacity
100MW
Status
Operational
Renewable Energy
Deploying renewable energy infrastructure is critical to us achieving Real Zero by 2030.
We’re creating a renewable energy ecosystem—building solar farms, wind installations, battery storage systems, and a 750km transmission network, Pilbara Energy Connect (PEC).
This network is designed to integrate our operations into a unified, green-powered grid.
PEC: Phase One
In 2024, we completed the first phase of PEC: a 100MW solar farm at North Star Junction, 140km of transmission lines, and substations.
By 2030, we will deploy 2-3GW of renewable energy generation and battery storage to eliminate fossil fuels from our Australian iron ore operations.

Fast Facts
26kms
Distance from our Iron Bridge operations
196,188
Solar panels installed
28
Solar panels with inverter stations to convert power for use across the broader transmission grid
2,500m x 800m
Approx. size of southern array
Decarbonising the Pilbara
We are future proofing our Pilbara operations by eliminating millions of litres of diesel every year from across our sites. We’re creating a renewable energy ecosystem – a network designed to integrate our operations into a unified, green-powered grid.

Sinead Booth
Group Manager Decarbonisation Delivery
Forward Focus
As we continue to decarbonise our Pilbara operations, our focus is now on expanding the PEC infrastructure.
This will provide an integrated transmission network, enabling renewable electricity that is generated at any of Fortescue’s sites to move between our operations.
Construction is set to commence on our 130MW Cloudbreak solar farm in March 2025.


Zero Emissions by 2030
Real Zero is our plan to eliminate our scope 1 and scope 2 emissions across our Australian iron ore operations, without voluntary carbon offsets. For the benefit of our planet, our shareholders, and future generations.

Global Operations
Our Metals business includes iron ore operations in the Pilbara and exploration projects across the globe, spanning sites from Australia to Latin America and Gabon.