3 February 2025
Operational Site
Our magnetite mining operation, located 145km south of Port Hedland on Nyamal Land.
Location
Australia
Product
Magnetite
Capacity
5-9Mtpa
Status
Operational
Our Iron Bridge facility produces a high-grade wet concentrate product which is transported to Port Hedland through a 135-kilometre-long specialist slurry pipeline.
Operated as an unincorporated joint venture between FMG Magnetite Pty Ltd (69%) and Formosa Steel IB Pty (31%), Iron Bridge is leading the way in sustainable magnetite production.
3 February 2025
26 September 2024
15 August 2024
12 August 2024
13 May 2024
21 March 2024
14 December 2023
23 July 2023
7 June 2023
30 April 2023
The Iron Bridge site is facilitating Fortescue’s transition towards Real Zero, becoming the first magnetite deposit to operate using renewable energy by 2030.
North Star Junction Solar farm supplies renewable power to the Iron Bridge grid.
65% of Iron Bridge’s warehouse operations fleet is battery electric.
Non Processing Infrastructure team exclusively uses battery tooling.
Real Zero is our plan to eliminate our scope 1 and scope 2 emissions across our Australian iron ore operations, without voluntary carbon offsets. For the benefit of our planet, our shareholders, and future generations.
Our Metals business includes iron ore operations in the Pilbara and exploration projects across the globe, spanning sites from Australia to Latin America and Gabon.