Operational Site
Our flagship iron ore mine and production site, located in the Pilbara tenement area on Eastern Guruma and Yindjibarndi Country.
Location
Australia
Product
Hematite
Capacity
100Mtpa (together with Eliwana)
Status
Operational
Our Solomon site forms part of our Western Hub - alongside our Eliwana site - and is central to our iron ore operations.
More than 70% of our 112-haul truck fleet at the Western Hub is fully autonomous and managed from our Hive centre in Perth. Iron ore from Solomon is transported 300kms by rail to Herb Elliott port in Port Hedland, where it is shipped to customers around the world.
3 February 2025
26 September 2024
15 August 2024
12 August 2024
13 May 2024
21 March 2024
14 December 2023
23 July 2023
7 June 2023
30 April 2023
Design and construction are underway for the on-site electrical reticulation infrastructure at Solomon. The system ensures that renewable energy from the PEC network is delivered to where it’s needed on site.
Transmission lines connect Solomon to Iron Bridge and Port Hedland, facilitating the first phase of the Pilbara Energy Connect (PEC) Project. This infrastructure allows for the flow of renewable energy across site, reducing emissions and improving efficiency.
Real Zero is our plan to eliminate our scope 1 and scope 2 emissions across our Australian iron ore operations, without voluntary carbon offsets. For the benefit of our planet, our shareholders, and future generations.
Our Metals business includes iron ore operations in the Pilbara and exploration projects across the globe, spanning sites from Australia to Latin America and Gabon.